Challenge
The successful replacement of 600 devices.
The challenge was to replace all 600 client end devices—some 420 mobile devices and 180 all-in-one PCs—at all of the Graz University of Music and Performing Arts’ 18 locations with new Dell Technologies devices between October and November. Bechtle was responsible for the procurement, configuration and installation of the operating system (Windows 11), as well as for the removal of the old hardware and the delivery of the new. Bechtle installed, set up and commissioned the deployment service required in close collaboration with the University.